Preparation of project documentation for a railway overpass alongside Widzewska Street, at the stretch from Józefa Street to Nowogrodzka Street.
The investment project assumes construction of an overpass over the tracks, reconstruction of teletechnical infrastructure, drainage of the facility, construction of sidewalks providing access as well as reconstruction and construction of lighting system with power supply and monitoring. This footbridge for pedestrians and cyclists is supposed to ensure unrestricted movement of users over railroad tracks.
Considering the necessity of performance of cutting of trees and shrubs that collide with the project, substitute planting is planned. It was also necessary to obtain a permit for derogation from technical & construction regulations due to rapproachment of the facility to the boundary with the railroad area and the extreme track axis.