Projects

Our many years of experience have resulted in the successful completion of numerous projects. We have a team of qualified specialists across all sectors, enabling us to create comprehensive and functional solutions for the efficient execution of investments.

We present selected projects that we have completed throughout our operations.

Show: ongoing
Building investments 2025

Military complex in the Lublin Voivodeship

PROJECT VALUE
6 757 644,60 zł
STATUS
ongoing

PROJECT

Building investments

Military complex in the Lublin Voivodeship

investor

Voivodeship Roads Authority in Lublin

status

ongoing

PROJECT VALUE

6 757 644,60 zł

contract date

08.01.2025 r.

execution date

In progress

project description

Preparation of design and cost estimate documentation for the reconstruction or construction of 64 warehouses, adaptation of 6 warehouses for the storage of material resources, construction of 10 warehouses for material resources, construction of infrastructure roads accompanying supervision in the complex in the Lublin Voivodeship, along with the author’s supervision during the execution of works.

detailed description

Preparation of design and cost estimate documentation for the reconstruction or construction of 64 warehouses, adaptation of 6 warehouses for the storage of material resources, construction of 10 warehouses for material resources, construction of infrastructure roads accompanying supervision in the complex in the Lublin Voivodeship, along with the author’s supervision during the execution of works. The implementation of the project is associated with access to classified information with the CONFIDENTIAL clause.

Building investments 2025

University Clinical Hospital No. 1 PUM in Police

PROJECT VALUE
499 000,00 zł
STATUS
ongoing

PROJECT

Building investments

University Clinical Hospital No. 1 PUM in Police

investor

University Clinical Hospital No. 1 named after Prof. Tadeusz Sokołowski, Pomeranian Medical University in Szczecin

status

ongoing

PROJECT VALUE

499 000,00 zł

contract date

14.04.2025 r.

execution date

In progress

project description

“Reconstruction and modernization of the external sanitary installation (water supply, fire protection, sanitary sewage, stormwater drainage), including the design of a new water connection at USK – 1 PUM in Police, 2 Siedlecka Street.”

detailed description

At the request of the University Clinical Hospital No. 1 of the Pomeranian Medical University in Police, located at 2 Siedlecka Street, Eco5tech is carrying out the development of design and cost documentation covering the reconstruction and modernization of external and internal sanitary installations (cold water, fire protection, stormwater and sanitary sewage systems), the construction of a new water connection from Siedlecka Street, and the modernization of the water intake together with the water treatment station (WTS). The project includes, among other things, the implementation of a backup water supply source, the creation of a looped water installation, the adaptation of the WTS to modern technological requirements, and the application of a temporary pilot water treatment installation for technical and design evaluation purposes.

Road investments 2025

Elimination of landslides and expansion of roads in the Kuyavian-Pomeranian Voivodeship

PROJECT VALUE
1 380 000,00 zł
STATUS
ongoing

PROJECT

Road investments

Elimination of landslides and expansion of roads in the Kuyavian-Pomeranian Voivodeship

investor

Voivodeship Road Authority in Bydgoszcz

status

ongoing

PROJECT VALUE

1 380 000,00 zł

contract date

03.09.2025 r.

execution date

In progress

project description

Elimination of landslides along with the expansion of voivodeship roads No. 266, 269, 538, and 543” – development of design documentation.

detailed description

The investment project concerns the development of design documentation for the task involving the elimination of landslides along with the expansion of voivodeship roads No. 266, 269, 538, and 543 in the towns of Wójcin, Chotel, Plesewo, and Rozental, including the provision of investor supervision. The scope of the work includes, among other things: identifying the causes of landslide formation; developing concepts and construction designs for landslide stabilization; modernizing drainage systems; adapting the technical parameters of the roads to applicable regulations; and implementing road safety measures (signage, lighting, reconstruction of junctions). The project also covers tree inventory and removal, replacement planting, and obtaining the required administrative decisions. The implementation of the investment will ensure the permanent stabilization of areas at risk of landslides and improve the safety and comfort of users of the voivodeship roads, which constitute important communication links in the region.

Road investments 2025

WAT – Reconstruction and Construction of Entrances

PROJECT VALUE
862 599,00 zł
STATUS
ongoing

PROJECT

Road investments

WAT – Reconstruction and Construction of Entrances

investor

Military University of Technology

status

ongoing

PROJECT VALUE

862 599,00 zł

contract date

11.09.2025 r.

execution date

In progress

project description

Preparation of design and cost documentation for the reconstruction of the entrance from Kaliski Street and the construction of a new entrance from Radiowa Street.

detailed description

At the request of the Military University of Technology in Warsaw, Eco5tech is carrying out the comprehensive preparation of a construction project for the reconstruction of the intersection, including a site development plan, architectural and construction design, and technical design, as well as providing author supervision throughout the duration of the contract. The main objective of the investment is to improve traffic flow and capacity, thereby increasing the safety of users entering and exiting the WAT campus, through measures such as the reconstruction of the intersection, the redevelopment of the entrance zones from Kaliski Street and Radiowa Street, and the construction of a road section connecting the entrance zones to the internal road network within the WAT campus.

Road investments 2024

Construction of bicycle infrastructure in Bydgoszcz

PROJECT VALUE
547 350,00 zł
STATUS
ongoing

PROJECT

Road investments

Construction of bicycle infrastructure in Bydgoszcz

investor

City of Bydgoszcz - Municipal Roads and Public Transport Authority in Bydgoszcz

status

ongoing

PROJECT VALUE

547 350,00 zł

contract date

27.06.2024 r.

execution date

In progress

project description

Development of project documentation for the construction of bicycle infrastructure in Bydgoszcz: Part 2 – Wyzwolenia Street on the section from Sudecka Street to the border of the city of Bydgoszcz and part 3 – Kolbego Street on the section from Waleniowa Street to the border of the city of Bydgoszcz

detailed description

Eco5tech S.A. has concluded 2 agreements with the City of Bydgoszcz represented by the Municipal Roads and Public Transport Authority in Bydgoszcz for the implementation of public tasks concerning the development of project documentation for the construction of bicycle infrastructure in Bydgoszcz in the scope of two sections: Part 2 – Wyzwolenia Street on the section from Sudecka Street to the border of the city of Bydgoszcz and Part 3 – Kolbego Street on the section from Waleniowa Street to the border of the city of Bydgoszcz, along with the author’s supervision. The scope of work includes, among others, the preparation of a project for lighting the pedestrian and bicycle route and the existing roadway, a project for street drainage and an inventory of equipment and networks located in the designed road lane. The implementation of the investment also provides for the preparation of conceptual drawings, taking into account the possibility of the final construction of a bus lane for public transport buses. The total length of both designed sections is over 2 km.

Road investments 2024

Construction of the voivodeship road No. 635

PROJECT VALUE
4 537 470,00 zł
STATUS
ongoing

PROJECT

Road investments

Construction of the voivodeship road No. 635

investor

Mazovian Voivodeship Roads Authority in Warsaw

status

ongoing

PROJECT VALUE

4 537 470,00 zł

contract date

22.07.2024 r.

execution date

In progress

project description

Development of design documentation for the construction of the voivodeship road No. 635 on the section from the city of Czarna n the area of the Wołomin commune to the intersection with the national road No. 2 in the area of the town of Nowy Konik, Halinów commune

detailed description

The subject of the contract includes the development of design documentation, at the stage of the program concept, as well as obtaining a decision on environmental conditions for the construction of the voivodeship road No. 635 on the section from m. Czarna in the area of the Wołomin commune to the intersection with the national road No. 2 in the town of Nowy Konik, Halinów commune. The estimated length of the newly designed section will be about 21 km running through the Wołomin commune, the Poświętne commune, the Zielonka commune in the Wołomin district, and the Halinów commune in the Minsk district. The project assumes, including the construction of the main roadway with the accompanying infrastructure, the execution of road drainage, and the development of the necessary elements of traffic organization and safety. The designed route will be of key importance for improving the quality of life of residents by creating new economic opportunities and increasing transport accessibility.

Infrastructure investments 2024

Construction of photovoltaic cells in buildings in the Papowo Biskupie Commune

PROJECT VALUE
2 824 633,50 zł
STATUS
ongoing

PROJECT

Infrastructure investments

Construction of photovoltaic cells in buildings in the Papowo Biskupie Commune

investor

Papowo Biskupie Commune

status

ongoing

PROJECT VALUE

2 824 633,50 zł

contract date

25.09.2024 r.

execution date

In progress

project description

Construction of photovoltaic cells with energy storage and change of heating in public buildings.

detailed description

The investment project concerns the implementation of a “design and build” task consisting in the construction of photovoltaic cells with energy storage and a change in the method of heating in public buildings in the Papowo Biskupie Commune. The investment includes the performance of comprehensive energy modernization of existing public utility buildings, including thermal modernization of buildings, modernization of the interior lighting system based on LED sources and replacement of window joinery. As part of the investment, it is planned to build 7 hybrid photovoltaic installations with capacities ranging from 1.0 kWp to 40.0 kWp. The planned construction of photovoltaic installations is aimed at increasing energy independence and improving air quality by reducing emissions of pollutants into the atmosphere.

Building investments 2023

Construction of the "LEŚNIK" Recreation and Training Center in Zakopane-Jaszczurówka

PROJECT VALUE
724 470,00 zł
STATUS
ongoing

PROJECT

Building investments

Construction of the "LEŚNIK" Recreation and Training Center in Zakopane-Jaszczurówka

investor

Nowy Targ Forest District – State Forests National Forest Holding.

status

ongoing

PROJECT VALUE

724 470,00 zł

contract date

01.12.2023 r.

execution date

In progress

project description

“Development of design and cost estimate documentation for the investment entitled Construction of the “Leśnik” RECREATION AND TRAINING CENTER in Zakopane-Jaszczurówka”.

detailed description

The investment is being carried out as part of a consortium of Eco5tech S.A. and a company from the design and construction industry. The subject of the contract is the development of multi-discipline design and cost estimate documentation for the investment entitled Construction of the “Leśnik” Recreation and Training Center in Zakopane-Jaszczurówka with technical infrastructure along with obtaining a building permit and the development of design and cost estimate documentation for the demolition of the building of the existing “Leśnik” Forest Education Center in Zakopane-Jaszczurówka along with obtaining a demolition permit. The scope of the contract also includes the performance of author’s multi-discipline supervision over the implementation of construction works, based on the prepared design and cost estimate documentation. The designed building will be a service, recreational and educational facility. The design documentation of the facility includes, m.in, such rooms as: reception hall, lobby with bar, restaurant, fireplace room, ski room, bowling alley, as well as apartments and hotel rooms with baths. The investment area is located within the boundaries of the Tatra National Park and the NATURA 2000 PLCI 20001 TATRY area, as well as within the boundaries of the mining area and the mining area of thermal waters “Zakopane” and GZWP No. 441.

Building investments 2022

Training Centre of the National School of Judiciary and Public Prosecution in Dębe

PROJECT VALUE
462 405,70 zł
STATUS
finished

PROJECT

Building investments

Training Centre of the National School of Judiciary and Public Prosecution in Dębe

investor

National School of Judiciary and Public Prosecution

status

finished

PROJECT VALUE

462 405,70 zł

contract date

28.07.2022 r.

execution date

12.2023 r.

project description

Task 1: “General renovation of the Training Center Complex of the National School of Judiciary and Public Prosecution in Dębe, Serock municipality, on plots no. 313/8 and 313/17, precinct 004 Dębe.”

Task 2:”Construction, reconstruction, and renovation of the Didactic Building ‘D’ at the Training Center of the National School of Judiciary and Public Prosecution in Dębe, Serock municipality, on plot no. 313/17, precinct 004 Dębe.”

detailed description

The order includes updating the technical documentation for the task entitled “Extension of the voivodeship road No. 255 Pakość – Strzelno from km 2+220 to km 21+910” in the scope of selected sections: section c) Broniewice roundabout, section d) Trągel bypass, section g) Rzadkwin roundabout and section h) Rzadkwin – Bławaty. The investment is located in the southern part of the Kujawsko-Pomorskie Voivodeship, in the Inowrocław and Mogilno districts. The task provides for updating the technical documentation in the field of, m.in., the geometric layout of the road and the construction of the surface, solutions for road drainage and water and sewage management, designs of intersections, roundabouts, pedestrian and bicycle routes, and bus bays. The key objectives of the investment are to increase road safety through the reconstruction of collision intersections, improve the flow of road traffic, and develop the transport accessibility of the region.

Road investments 2022

Extension of the provincial road No. 733

PROJECT VALUE
1 202 310,85 zł
STATUS
ongoing

PROJECT

Road investments

Extension of the provincial road No. 733

investor

Mazovian Voivodeship Roads Authority in Warsaw

status

ongoing

PROJECT VALUE

1 202 310,85 zł

contract date

03.06.2022 r.

execution date

In progress

project description

Preparation of project documentation for the extension of the voivodeship road No. 733 on the section from km 42+100 to km 44+656 in the area of Odechów, Skaryszew Commune, Radom District – Procedure No. 060/22

detailed description

The investment in question includes the development of design documentation, technical specifications for the execution and acceptance of construction works, as well as obtaining a decision on environmental conditions, a water law permit and a decision on a permit for the implementation of a road investment for the extension of the voivodeship road No. 733 in the area of the city. Odechów, Skaryszew Commune, Radom County. The design solutions provide for the extension of the provincial road No. 733 to class G in the existing single-carriageway cross-section. As part of the investment, it is planned, m.in, to improve road drainage, rebuild and build intersections, bus bays and exits, pavements, pedestrian crossings, and the construction of shoulders, individual and public exits. The aim of the project is to improve the technical parameters of the road, increase road safety, as well as adapt the route to current and forecasted traffic conditions and the needs of the local community.

Building investments 2022

Construction of the ZDiUM warehouse in Wrocław

PROJECT VALUE
669 106,47 zł
STATUS
ongoing

PROJECT

Building investments

Construction of the ZDiUM warehouse in Wrocław

investor

Road and City Maintenance Authority in Wrocław

status

ongoing

PROJECT VALUE

669 106,47 zł

contract date

07.07.2022 r.

execution date

In progress

project description

Development of project documentation for the task entitled “Construction of a warehouse at Piołunowa Street in Wrocław with accompanying infrastructure – ZDiUM warehouse”.

detailed description

The subject of the contract is the development of design documentation covering the construction of a warehouse and office facility, along with the accompanying infrastructure, including in particular a fenced shelter, a gatehouse, paved internal roads, a truck scale, and a monitoring and lighting system. The designed facility will be designed to store stone materials from the demolition of Wrocław city. The investment is aimed at reducing the traffic load in the city and improving road logistics and material management.

Road investments 2022

Construction of the eastern bypass of Gabin

PROJECT VALUE
1 145 999,54 zł
STATUS
ongoing

PROJECT

Road investments

Construction of the eastern bypass of Gabin

investor

Mazovian Voivodeship Roads Authority in Warsaw

status

ongoing

PROJECT VALUE

1 145 999,54 zł

contract date

08.07.2022 r.

execution date

In progress

project description

Preparation of design documentation, as well as obtaining a decision on environmental conditions for the construction of the eastern bypass of Gąbin on behalf of the Contracting Authority.

detailed description

The project concerns the development of project documentation and obtaining a decision on environmental conditions for the construction of the eastern bypass of Gąbin. The design documentation takes into account the construction of a new section of the provincial road No. 577 with Warszawska Street in Gąbin. The project will include, m.in, the construction of roadways, roadsides, intersections, engineering structures, additional roadways, pedestrian and bicycle paths, bus bays, a drainage system, the construction of other necessary road elements, as well as the collection and construction of the existing technical infrastructure colliding with the newly built road. The eastern bypass of Gąbin is the second stage of the construction of a road ring around the city. The route will bypass the city from the east and connect DW No. 577 from Sochaczew and DW No. 574 leading to Płock. The bypass is designed to divert transit traffic from the east of the Mazowieckie Voivodeship towards Płock. The new route will be about 3.5 kilometers long.

Road investments 2022

Extension of the voivodeship road No. 255

PROJECT VALUE
949 169,94 zł
STATUS
ongoing

PROJECT

Road investments

Extension of the voivodeship road No. 255

investor

Voivodeship Roads Authority in Bydgoszcz

status

ongoing

PROJECT VALUE

949 169,94 zł

contract date

30.12.2022 r.

execution date

In progress

project description

Updating the technical documentation for the task entitled “Extension of the voivodeship road No. 255 Pakość – Strzelno from km 2+220 to km 21+910
1) section c) Broniewice roundabout, from km 8+740 to km 9+180, length 0.440 km,
2) section d) Trągel Bypass, from km 9+180 to km 12+280, length 3.100 km,
3) section g) Rzadkwin roundabout, from km 18+050 to km 18+910, length 0.860 km,
4) section h) Rzadkwin – Bławaty, from km 18+910 to km 21+910, length 3,000 km.

detailed description

The order includes updating the technical documentation for the task entitled “Extension of the voivodeship road No. 255 Pakość – Strzelno from km 2+220 to km 21+910” in the scope of selected sections: section c) Broniewice roundabout, section d) Trągel bypass, section g) Rzadkwin roundabout and section h) Rzadkwin – Bławaty. The investment is located in the southern part of the Kujawsko-Pomorskie Voivodeship, in the Inowrocław and Mogilno districts. The task provides for updating the technical documentation in the field of, m.in, the geometric layout of the road and the construction of the surface, solutions for road drainage and water and sewage management, designs of intersections, roundabouts, pedestrian and bicycle routes and bus bays. The key objectives of the investment are to increase road safety through the reconstruction of collision intersections, improve the flow of road traffic and develop the transport accessibility of the region.

Road investments 2021

Extension of the voivodeship road No. 579

PROJECT VALUE
899 130,00 zł
STATUS
ongoing

PROJECT

Road investments

Extension of the voivodeship road No. 579

investor

Mazovian Voivodeship Roads Authority in Warsaw

status

ongoing

PROJECT VALUE

899 130,00 zł

contract date

29.03.2021 r.

execution date

In progress

project description

Preparation of project documentation, as well as obtaining on behalf of the Contracting Authority: water law consent (within the meaning of the Water Law Act), decision on the permit for the implementation of a road investment, for the expansion and construction of the voivodeship road 579 on the section from the city of Błonie (Żukówka Street) km 29+284 to the junction on the A2 motorway in the Grodzisk Mazowiecki commune

detailed description

The investment task assumes the development of design documentation, technical specifications for the execution and acceptance of construction works, and obtaining a decision on environmental conditions, a water law permit, and a decision on a permit for the implementation of a road investment for the expansion and construction of the voivodeship road No. 579 on the section from the city of A. Błonie to the junction on the A2 motorway in the Grodzisk Mazowiecki commune. The modernization of the road provides for the adaptation of its parameters to current technical standards, including widening the roadway, building drainage, rebuilding intersections, and taking into account infrastructure for pedestrians and cyclists. The planned expansion of DW 579 is aimed at improving the capacity of the road, increasing the safety of road users, and improving the local connection with the A2 motorway, which is important for transit traffic and economic development of the region.

Road investments 2020

Construction of the S-5 on the section Nowe Marzy - Bydgoszcz

PROJECT VALUE
6 423 073,97 zł
STATUS
finished

PROJECT

Road investments

Construction of the S-5 on the section Nowe Marzy - Bydgoszcz

investor

Investor: GDDKiA Branch in Bydgoszcz Contracting Authority; Eco: a consortium of companies - Przedsiębiorstwo Budowy Dróg i Mostów Kobylarnia S.A. and MIRBUD S.A.

status

finished

PROJECT VALUE

6 423 073,97 zł

contract date

10.04.2020 r.

execution date

01.09.2023 r.

project description

Continuation of the design and construction of the S-5 expressway on the section Nowe Marzy – Bydgoszcz – border of the Kujawsko-Pomorskie and Wielkopolskie voivodeships on the section from the “Białe Błota” junction (without the junction) to the “Szubin” junction (without the junction) with a length of approx. 9.7 km.

detailed description

The subject of the contract is the continuation of the design and construction of the S-5 expressway on the section constituting the border of the Kujawsko-Pomorskie and Wielkopolskie Voivodeships on the section from the “Białe Błota” junction to the “Szubin” junction. The S5 expressway is one of the largest investments carried out in the country. The route runs from the south to the north, connecting four large agglomerations: Wrocław, Poznań, Bydgoszcz and Gdańsk, thus becoming one of the main roads of a fundamental nature for the country’s economy. The S5 road will run from the A1 motorway in Nowe Marzy near Grudziądz to Mielno on the border with Wielkopolska Street. The construction of the S-5 expressway will improve safety and reduce the number of accidents. It will also relieve the burden on towns to a large extent by taking over transit traffic. It is worth noting that the Bydgoszcz bypass together with the S5 route not only facilitates communication, but also strengthens the economic potential of the entire Bydgoszcz Metropolis. Within the junctions on the bypass, investors have purchased land for new logistics centers.

Infrastructure investments 2021

Construction of bicycle paths in Krakow

PROJECT VALUE
1 054 734,00 zł
STATUS
ongoing

PROJECT

Infrastructure investments

Construction of bicycle paths in Krakow

investor

Municipality of Krakow

status

ongoing

PROJECT VALUE

1 054 734,00 zł

contract date

16.07.2021 r.

execution date

In progress

project description

Development of project documentation for bicycle paths in selected locations in the city of Krakow as part of the task “Bicycle Path Construction Program”.

detailed description

Eco5tech has signed a total of 5 contracts for the construction of bicycle paths in the city of Krakow as part of the “Bicycle Paths Construction Program” task. As part of the project, we have developed documentation for the construction of a bicycle road along Nowojki Street, a section of Walerego Sławka Street from the intersection with Kamieńskiego Street to the intersection with Puszkarska Street, in the XV Mistrzejowice District, i.e. along Jancarza Street in Krakow, the southern side of Pokoju Avenue, and the development of a multi-variant concept for the construction of a bicycle path connecting the existing bicycle routes along Powstańców Śląskich Avenue, Powstańców Wielkopolskich, Wielicka Street – SKA Podgórze junction.

Road investments 2021

Extension of the voivodeship road No. 632

PROJECT VALUE
1 023 500,01 zł
STATUS
ongoing

PROJECT

Road investments

Extension of the voivodeship road No. 632

investor

Mazovian Voivodeship Roads Authority in Warsaw

status

ongoing

PROJECT VALUE

1 023 500,01 zł

contract date

03.08.2021 r.

execution date

In progress

project description

Preparation of design documentation, as well as obtaining on behalf of the Contracting Authority a decision on environmental conditions, water law approval, a decision on a permit for the implementation of a road investment for the extension of the voivodeship road No. 632 from m. Józefów to the intersection with the provincial road No. 633 in the town of Józefów. Rembelszczyzna in the commune of Nieporęt, Legionowo district

detailed description

The subject of the investment includes the development of design documentation, technical specifications for the execution and acceptance of construction works and obtaining a decision on environmental conditions, a water law permit and a decision on a permit for the implementation of a road investment for the extension of the voivodeship road No. 632 from m. Józefów to the intersection with the provincial road No. 633 in the town of Józefów. Rembelszczyzna in the Nieporęt commune, Legionowo district. The scope of works provides for the expansion of the existing section of the provincial road No. 632 in order to improve its technical and functional parameters, increase road safety and improve capacity on an important communication route in the region. The section covered by the study connects the village of Józefów with the intersection with the provincial road No. 633 in the Rembel region, being an important element of the road system in the Legionowo district. The investment envisages, m.in, the construction of new sidewalks and a bicycle path, the reconstruction of existing intersections, the reconstruction of interconnecting networks and technical infrastructure, and the change in the geometry of the road. The investment is an important step towards improving the safety and comfort of everyday life of the inhabitants of the Nieporęt commune and improving local communication.

Road investments 2021

Voivodeship road No. 637 in the Stanisławów Commune

PROJECT VALUE
1 017 025,50 zł
STATUS
ongoing

PROJECT

Road investments

Voivodeship road No. 637 in the Stanisławów Commune

investor

Mazovian Voivodeship Roads Authority in Warsaw

status

ongoing

PROJECT VALUE

1 017 025,50 zł

contract date

25.08.2021 r.

execution date

In progress

project description

Preparation of project documentation, as well as obtaining on behalf of the Contracting Authority: a decision on environmental conditions, a water law consent (within the meaning of the Water Law Act), a decision on a permit for the implementation of a road investment for the construction of the voivodeship road 637 in the Stanisławów commune.

detailed description

The investment task assumes the development of design documentation, technical specifications for the execution and acceptance of construction works and obtaining a decision on environmental conditions, a water law consent and a decision on a permit for the implementation of a road investment for the construction of road No. 637 in the Stanisławów commune. The designed route will be a new route of the provincial road No. 637, the aim of which is to improve the capacity and traffic safety in the region. The documentation will include, m.in: the construction of the main roadway, shoulders, intersections, engineering structures, additional roadways, pedestrian and bicycle paths, bus bays and a drainage system. The task is of strategic importance for the communication system of the eastern part of the Mazowieckie Voivodeship, and its implementation will contribute to improving transport accessibility and diverting transit traffic from the city center, which will relieve the local streets. The investment is part of a broader plan to modernise the provincial road No. 637, connecting Warsaw with Węgrów, and is of key importance for improving the transport system in the region.

Road investments 2021

Extension of the voivodeship road No. 801

PROJECT VALUE
1 526 987,48 zł
STATUS
ongoing

PROJECT

Road investments

Extension of the voivodeship road No. 801

investor

Mazovian Voivodeship Roads Authority in Warsaw

status

ongoing

PROJECT VALUE

1 526 987,48 zł

contract date

30.08.2021 r.

execution date

In progress

project description

Preparation of design documentation, as well as obtaining on behalf of the Ordering Party:
• decisions on environmental conditions,
• water law consent (within the meaning of the Water Law Act),
• decision on permitting the implementation of a road investment,
for the extension of the provincial road No. 801 on the section from the intersection with the national road No. 50 in the town of Piotrowice, Karczew commune to the intersection with the provincial road No. 805 and the provincial road No. 799 in the town of Dziecinów, Sobienie Jeziory commune, Otwocki district

detailed description

The scope of the investment includes the development of design documentation, technical specifications for the execution and acceptance of construction works, as well as obtaining a decision on environmental conditions, a water law permit and a decision on a permit for the implementation of a road investment for the extension of the provincial road No. 801 on the section from the intersection with the national road No. 50 in the city of Piotrowice, Karczew commune, to the intersection with the provincial road No. 805 and the provincial road No. 799 in the city of Dziecinów, Sobienie Jeziory commune, Otwock district. The planned extension assumes raising the technical standard of the road and adapting it to current and forecasted traffic needs. The investment envisages, among other things, the modernization of intersections with local roads, the widening of the roadway, and the construction and reconstruction of pavements, bicycle paths, and pedestrian and bicycle routes. The designed section is an important part of the route leading along the eastern bank of the Vistula River, which is an alternative connection with the southern part of the Mazowieckie Voivodeship. Its modernization will improve the communication of the Otwock district area with the network of national and provincial roads.

Infrastructure investments 2020

Passage over the railway tracks along Widzewska Street

PROJECT VALUE
484 870,00 zł
STATUS
finished

PROJECT

Infrastructure investments

Passage over the railway tracks along Widzewska Street

investor

Municipal Office Łódź, Municipal Investment Board

status

finished

PROJECT VALUE

484 870,00 zł

contract date

28.01.2020 r.

execution date

10.2021 r.

project description

Preparation of design documentation for the passage over the railway tracks along Widzewska Street on the section from Józefa Street to Nowogrodzka Street and the reconstruction of the 110 kV high-voltage line.

detailed description

The investment includes the construction of a passage over the tracks, as well as the reconstruction of teletechnical infrastructure, drainage of the facility, the construction of pavements providing access, as well as the reconstruction and construction of lighting with power supply and monitoring. The pedestrian and bicycle bridge is to enable collision-free movement of users over the railway track. Due to the need to cut down the conflicting trees and shrubs, replacement plantings are planned. It was also necessary to obtain consent for a derogation from the technical and construction regulations due to the approach of the facility to the border of the railway area and the axis of the extreme track.

Inwestycje budowlane 2020

Military complex in Lublin

PROJECT VALUE
1 217 700,00 zł
STATUS
finished

PROJECT

Inwestycje budowlane

Military complex in Lublin

investor

Regional Infrastructure Board Lublin

status

finished

PROJECT VALUE

1 217 700,00 zł

contract date

13.07.2020 r.

execution date

30.04.2021 r.

project description

Adaptation and development of design and cost estimate documentation for the construction of two staff and barracks buildings with accompanying infrastructure in the military complex at Herberta Street in Lublin along with the author’s supervision during the implementation of construction works

detailed description

The preparation of the documentation involved access to classified information with the CONFIDENTIAL clause. The investment plan envisages the construction of two headquarters and barracks buildings and external infrastructure, which includes, m.in example, external sanitary networks and connections (water supply, heating, sanitary and rainwater sewage systems), medium and low voltage networks, power connections, a transformer station, a power generator, a teletechnical sewerage system and small architecture facilities in the Military Complex. The designed buildings, together with built-in installations and technical devices, will be used to secure the needs for accommodation of the soldiers of the complex in question, resulting from the implementation of tasks related to the functioning of the unit.

Infrastructure investments 2020

Construction of a tunnel along Wieniecka Street

PROJECT VALUE
848 603,86 zł
STATUS
ongoing

PROJECT

Infrastructure investments

Construction of a tunnel along Wieniecka Street

investor

Municipality of Włocławek

status

ongoing

PROJECT VALUE

848 603,86 zł

contract date

18.09.2020 r.

execution date

In progress

project description

Development of project documentation – “Construction of a tunnel along Wieniecka Street”.

detailed description

The investment in question includes the comprehensive construction of a new communication system enabling collision-free and safe passage through the railway line No. 18. Kutno-Piła, vehicles, and pedestrian crossings moving along Wieniecka Street under the above-mentioned line. This task also includes ensuring the accessibility of adjacent properties to public roads, adapting neighboring streets to the changed organization and traffic intensity, as well as increased road load.

Road investments 2020

Construction of a road connecting the Michelin estate with the Południe housing estate

PROJECT VALUE
399 100,00 zł
STATUS
finished

PROJECT

Road investments

Construction of a road connecting the Michelin estate with the Południe housing estate

investor

Municipality of Włocławek

status

finished

PROJECT VALUE

399 100,00 zł

contract date

16.10.2020 r.

execution date

16.11.2022 r.

project description

Preparation of design documentation for the construction of roads connecting the Michelin estate with Wiejska Street as part of the task entitled “Construction of a road constituting an alternative connection between the Michelin estate and the Południe housing estate”

detailed description

The task concerns the development of design documentation along with technical specifications for the execution and acceptance of construction works for the construction of roads connecting the Michelin estate with Wiejska Street. The investment in question includes the comprehensive construction of new communication routes constituting part of a larger project related to the construction of a road planned by the City of Włocławek as an alternative connection between the Michelin estate and the Południe housing estate. The implementation of the investment is aimed at increasing road safety and improving transport accessibility and traffic flow in the southern part of the city.

Infrastructure investments 2019

Military complex in Łomża

PROJECT VALUE
785 600,00 zł
STATUS
finished

PROJECT

Infrastructure investments

Military complex in Łomża

investor

Regional Infrastructure Board Olsztyn

status

finished

PROJECT VALUE

785 600,00 zł

contract date

03.10.2019 r.

execution date

maj 2021 r.

project description

Investment program and construction and executive documentation with the cost estimate part and conducting author’s supervision during the implementation of construction and assembly works for: task 35236 – construction of a multi-branch warehouse with accompanying infrastructure in Łomża.

detailed description

The preparation of the documentation involved access to classified information with the CONFIDENTIAL clause. The investment plan envisages the construction of two headquarters and barracks buildings and external infrastructure, which includes, m.in example, external sanitary networks and connections (water supply, heating, sanitary and rainwater sewage systems), medium and low voltage networks, power connections, a transformer station, a power generator, a teletechnical sewerage system and small architecture facilities in the Military Complex. The designed buildings, together with built-in installations and technical devices, will be used to secure the needs in terms of accommodation for the soldiers of the complex in question, resulting from the implementation of tasks related to the functioning of the unit.

Infrastructure investments 2019

Railway infrastructure Masymilianowo-Kościerzyna

PROJECT VALUE
3 158 657,22 zł
STATUS
ongoing

PROJECT

Infrastructure investments

Railway infrastructure Masymilianowo-Kościerzyna

investor

Investor: PKP PLK S.A. Ordering Eco: MGGP S.A.

status

ongoing

PROJECT VALUE

3 158 657,22 zł

contract date

25.03.2019 r.

execution date

In progress

project description

Development of design documentation for the implementation of works on the section Maksymilianowo – Kościerzyna of railway line No. 201 with author’s supervision” as part of the project entitled: “Works on the alternative transport route Bydgoszcz – Trójmiasto.

detailed description

The aim of the project is, m.in, to adapt the railway infrastructure to the real needs of carriers and contractors and to the forecasted directions of development, to increase the speed of trade, to improve the punctuality of passenger transport connections or to increase the availability of rail transport. Railway line No. 131 on the designed section – Maksymilianowo station – from km 377.600 to km 382.404 is a line of national importance, in the AGTC agreement, double-track, electrified. The Maksymilianowo – Kościerzyna section of railway line No. 201 covered by the scope of the contract is located in the Pomeranian Voivodeship, in the Kościerski, Chojnice and Starogard Districts and in the Kujawsko-Pomorskie Voivodeship in the following counties: Bydgoszcz, Świecki, Tuchola. The scope of the project implemented by the Company includes the sanitary and road industry, as well as the development of a water law report.

Road investments 2019

Construction of engineering structures on the S7 expressway

PROJECT VALUE
590 400,00 zł
STATUS
finished

PROJECT

Road investments

Construction of engineering structures on the S7 expressway

investor

Investor: The Treasury -General Directorate for National Roads and Motorways

status

finished

PROJECT VALUE

590 400,00 zł

contract date

02.05.2019 r.

execution date

02.05.2019 r.

project description

Execution of a construction design, detailed design, bill of quantities for some engineering structures for the task: “Design and construction of the S7 Warsaw-Kraków expressway, section of the border of the Świętokrzyskie Voivodeship – Kraków, implementation section Widoma (without the junction) – Kraków (excluding the Igołomska junction) with a length of approx. 18.3 km”

detailed description

The project concerned the development of design documentation for the construction of a two-lane expressway together with engineering structures and accompanying infrastructure in the field of the bridge industry. As part of the investment, an expressway will be built with a length of approx. 18.3 km with four road junctions (Łuczyce, Raciborowice, Mistrzejowice, Grębałów). Engineering structures, access and technological roads, retaining walls, emergency crossings and emergency entrances to the expressway will be implemented. The existing engineering structures, the road network (exits, streets), tram and railway infrastructure, the drainage network and devices will be rebuilt. Pedestrian pavements, bicycle paths, street lighting and technical infrastructure will be built or rebuilt. The construction of environmental protection devices is also planned, including, among others, insulating green belts, acoustic and anti-glare screens, culverts and ecological passages along with a protection, guidance and rainwater drainage system.

Inwestycje drogowe 2019

Extension of national road No. 12 on the section Lipinki Łużyckie - Żary

PROJECT VALUE
1 119 587,21 zł
STATUS
ongoing

PROJECT

Inwestycje drogowe

Extension of national road No. 12 on the section Lipinki Łużyckie - Żary

investor

Ordering Eco: Voessing Polska Sp. z o.o.

status

ongoing

PROJECT VALUE

1 119 587,21 zł

contract date

25.02.2019 r.

execution date

ongoing

project description

Preparation of documentation entitled Extension of national road No. 12 on the section Lipinki Łużyckie – Żary

detailed description

The investment is aimed at, m.in improving road safety by widening the roadway to a width of 8.0 m, eliminating dangerous places, building bus bays, pedestrian routes, traffic sewerage in towns and islands slowing down traffic. On the road section in question, the GP class road standard will be restored by bringing it to a load capacity of 11.5 t/axle. The road will meet the conditions regarding the needs of the defense of the Polish State. In addition, the extension of national road No. 12 will improve traffic for all traffic participants – drivers, pedestrians and cyclists, as well as improve the aesthetic values of the area. The project required the development of a complex document, which is an environmental impact assessment report. In the course of the design works, it was necessary to obtain consent for deviations from technical and construction regulations concerning the minimum distances between intersections in built-up areas and outside it, the width of the lane on curves, the location of the public exit in the intersection impact zone and the distance of the pedestrian crossing with traffic lights from the intersection.

Buildings investment 2019

Business Incubator in the Bydgoszcz Industrial and Technology Park

PROJECT VALUE
762 600,00 zł
STATUS
finished

PROJECT

Buildings investment

Business Incubator in the Bydgoszcz Industrial and Technology Park

investor

Bydgoski Park Przemysłowo-Technologiczny Sp. z o.o.

status

finished

PROJECT VALUE

762 600,00 zł

contract date

17.10.2019 r.

execution date

31.03.2021 r.

project description

Preparation of design and cost estimate documentation for the facility under the working name of Business Incubator in the Bydgoszcz Industrial and Technology Park, along with obtaining all documents necessary for the implementation of the investment.

detailed description

The subject of the project is the construction of a facility called Business Incubator located in the Bydgoszcz Industrial and Technology Park. The facility will consist of a production, warehouse and office part, connected by communication. In the office part, offices for rent to startup companies are planned. The production and warehouse part consists of a hall and a social and sanitary part. The plot has been fully equipped with technical infrastructure connections: heating network, water supply, sanitary and rainwater sewage, electricity and telecommunications. Paved manoeuvring areas, parking lots and internal roads have been designed around the building. The design process was initiated during the change of land use, related to the permanent exclusion of forest land from production. The design solutions should take into account that the investment was located near the site of protected plants (knotweed), which had to be left. In addition, permits had to be obtained for a derogation from the ban on the destruction of a protected species – the sand moth.

Infrastructure investments 2018

Construction of an installation within a military complex for the Groupie

PROJECT VALUE
2 043 665,00 zł
STATUS
finished

PROJECT

Infrastructure investments

Construction of an installation within a military complex for the Groupie

investor

Regional Infrastructure Board Bydgoszcz

status

finished

PROJECT VALUE

2 043 665,00 zł

contract date

05.02.2018 r.

execution date

2020 r.

project description

Task 1: “General renovation of the complexes of the Training Center of the National School of Judiciary and Public Prosecution in Dębe, in the Serock commune, on plots no. 313/8 and 313/17, precinct 004 Dębe.”

Task 2: “Construction, reconstruction, and renovation of Teaching Building “D” at the Training Center of the National School of Judiciary and Public Prosecution in Dębe, in the Serock commune, on plot no. 313/17, precinct 004 Dębe.”

detailed description

The order includes updating the technical documentation for the task entitled “Extension of the voivodeship road No. 255 Pakość – Strzelno from km 2+220 to km 21+910” in the scope of selected sections: section c) Broniewice roundabout, section d) Trągel bypass, section g) Rzadkwin roundabout and section h) Rzadkwin – Bławaty. The investment is located in the southern part of the Kujawsko-Pomorskie Voivodeship, in the Inowrocław and Mogilno districts. The task provides for updating the technical documentation in the field of, m.in., the geometric layout of the road and the construction of the surface, solutions for road drainage and water and sewage management, designs of intersections, roundabouts, pedestrian and bicycle routes, and bus bays. The key objectives of the investment are to increase road safety through the reconstruction of collision intersections, improve the flow of road traffic, and develop the transport accessibility of the region.

Buildings investment 2018

Reconstruction of the building of the National Prosecutor's Office in Warsaw

PROJECT VALUE
470 721,00 zł
STATUS
finished

PROJECT

Buildings investment

Reconstruction of the building of the National Prosecutor's Office in Warsaw

investor

National Prosecutor’s Office

status

finished

PROJECT VALUE

470 721,00 zł

contract date

16.05.2018 r.

execution date

14.12.2018 r.

project description

Preparation of construction and executive design documentation together with the cost estimate part and specification of execution and acceptance of construction works, partial reconstruction of the building of the National Prosecutor’s Office in Warsaw at 3 Postępu Street, and development of a material and financial schedule for the implementation of the investment

detailed description

The subject of the contract includes the preparation of construction and executive design documentation together with the cost estimate part and the specification of execution and acceptance of construction works, for the partial reconstruction of the building of the National Prosecutor’s Office in Warsaw at 3 Postępu Street. The project is aimed at adapting the facility to the functional, organizational and technical needs of the National Prosecutor’s Office.

Buildings investment 2018

Construction of the Long-Term Care Facility in Świnoujście

PROJECT VALUE
819 180,00 zł
STATUS
finished

PROJECT

Buildings investment

Construction of the Long-Term Care Facility in Świnoujście

investor

Investor: Municipality of Świnoujście (Ordering Eco: MIRBUD S.A.)

status

finished

PROJECT VALUE

819 180,00 zł

contract date

29.06.2018 r.

execution date

30.06.2021 r.

project description

Construction of the Long-Term Care Facility at Bydgoska Street in Świnoujście – in the design and build system

detailed description

The investment involves the construction of the main building of the Long-Term Care Facility, which will feature medical, social, and technical facilities. The building will serve as a modern stationary center intended for individuals with chronic illnesses who require constant nursing and medical care. The facility will be designed taking into account the highest functional and medical standards. The scope of the investment includes, m.in, the development of multi-discipline design documentation along with technical infrastructure, road system, parking lots and small architecture.

Road investments 2017

Reconstruction of the voivodeship road No. 551

PROJECT VALUE
243 990,00 zł
STATUS
finished

PROJECT

Road investments

Reconstruction of the voivodeship road No. 551

investor

Voivodeship Roads Authority in Bydgoszcz

status

finished

PROJECT VALUE

243 990,00 zł

contract date

17.05.2017 r.

execution date

17.12.2019 r.

project description

Development of detailed design for 3 parts:
Part no. 3 – for the task entitled: Reconstruction of the voivodeship road No. 551 Strzyżawa – Dąbrowa Chełmińska – Unisław – Wybcz – Chełmża – Wąbrzeźno on the section from km 35+823 to km 50+068

detailed description

Road investments 2017

Reconstruction of the voivodeship road No. 550 Chełmno - Brzozowo - Kokocko - Unisław

PROJECT VALUE
351 000,00 zł
STATUS
finished

PROJECT

Road investments

Reconstruction of the voivodeship road No. 550 Chełmno - Brzozowo - Kokocko - Unisław

investor

Voivodeship Roads Authority in Bydgoszcz

status

finished

PROJECT VALUE

351 000,00 zł

contract date

17.05.2017 r.

execution date

17.12.2019 r.

project description

Development of detailed design for 3 parts:
Part No. 2 – for the task entitled: Reconstruction of the voivodeship road No. 550 Chełmno – Brzozowo – Kokocko – Unisław on the section from km 5+090 to km 25+263

detailed description

Road investments 2017

Reconstruction of the provincial road No. 558 Lipno - Dyblin

PROJECT VALUE
227 550,00 zł
STATUS
finished

PROJECT

Road investments

Reconstruction of the provincial road No. 558 Lipno - Dyblin

investor

Voivodeship Roads Authority in Bydgoszcz

status

finished

PROJECT VALUE

227 550,00 zł

contract date

17.05.2017 r.

execution date

19.11.2018 r.

project description

Development of detailed design for 3 parts:
Part No. 1 – for the task entitled: Reconstruction of the voivodeship road No. 189 Jastrowie – Złotów – Więcbork on the section from km 33+255 to km 50+151

detailed description

Road investments 2017

Reconstruction of the provincial road No. 189 Jastrowie - Złotów - Więcbork

PROJECT VALUE
304 300,00 zł
STATUS
finished

PROJECT

Road investments

Reconstruction of the provincial road No. 189 Jastrowie - Złotów - Więcbork

investor

Voivodeship Roads Authority in Bydgoszcz

status

finished

PROJECT VALUE

304 300,00 zł

contract date

17.05.2017 r.

execution date

18.01.2019 r.

project description

Development of detailed design for 3 parts:
Part No. 1 – for the task entitled: Reconstruction of the voivodeship road No. 189 Jastrowie – Złotów – Więcbork on the section from km 33+255 to km 50+151

detailed description

Interested in
our solutions?

Get in touch, and we’ll determine how to best tailor them to your actual needs.

    I consent to the processing of my data in accordance with Privacy policy

    sixteen + ten =